The United Republic of Tanzania

Handeni National Project

Handeni Trunk Main (H.T.M.) Project

Handeni Truck Main Project (HTM) is allocated in Korogwe and Handeni District in Tanga region covering an area of 5,000-squire km with 316km of truck mains, 100km branch mains, 6 pumping stations, 56 water reservoirs, 163 DPÔÇÖs and 703 private connections. The project serves 79 villages including Handeni town covering a total population of 180,000 people. The system comprising of gravity and pumping components has two intakes both drawing water from river Pangani.
Mandera (Tabora) intake supplying water through a conventional treatment plant (with a Slow sand filter), which draw about 230m3/hr (5,520m3/day) while Mkumburu (Segera) intake draws about 170m3/hr. (4,080m3/day)

For more information click here to download the document.